Another mining company, «Nedra Kom, is exploring and producing hydrocarbons on the Aksaysky site on the basis of contract No. 4705-UVS-ME dated March 15, 2019.
The Terenozeksky district of the Kyzylorda region of the Republic of Kazakhstan is in charge of the Aksaysky site.
In 2019, the hydrocarbons exploration project for the Aksaysky site» was developed (according to Contract No. 4705-UVS-ME dated March 15, 2019), which was approved by the Ministry of Energy of the Republic of Kazakhstan. Based on this project, Aksaysky-1 well was drilled in 2020 with oil inflow with a flow rate of 8 m3/day in the well from the interval of 1569-1592 m.
In 2020, the report «Operational calculation of oil and dissolved gas reserves of the south-western uplift of Aksay Field along the productive Aryskum horizon» was compiled.
Based on the latest report, a trial operation project was drawn up for the southwestern uplift of Aksay Field, and a positive conclusion was received from the Ministry of Energy of the Republic of Kazakhstan. This project specifies well drilling and hydrocarbon production. In the same year, an addendum to the hydrocarbon exploration project for the Aksaysky site» was developed. According to the results of drilling the Aksaysky-2 exploration well, oil flow was also obtained.